A platform for research: civil engineering, architecture and urbanism
The Fort Snelling-Mendota bridge project
Notes on construction of high-level concrete bridge by Koss Construction Co., Des Moines; bridge is 4119 ft. long from end to end of abutments; there are 12 arch spans, 304 ft. each, center to center of piers.
The Fort Snelling-Mendota bridge project
Notes on construction of high-level concrete bridge by Koss Construction Co., Des Moines; bridge is 4119 ft. long from end to end of abutments; there are 12 arch spans, 304 ft. each, center to center of piers.
The Fort Snelling-Mendota bridge project
Minn. Federation Architectural Eng. Soc. -- Bul
Wheeler, W.H. (author)
1926
9 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Check levels made on fort snelling-mendota bridge
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1909
Mendota, minn. Shrinkage in mendota bridge
Engineering Index Backfile | 1933
|Reconstruction of the Historic Mendota a Bridge
British Library Conference Proceedings | 1995
|