A platform for research: civil engineering, architecture and urbanism
New concrete bridge at Galt
Old Ainslie Street bridge replaced by specially designed concrete structure built in winter months. See also Contract Rec., vol. 40, no. 33, Aug. 18, 1926, pp. 780-781, 2 figs. New structure over mill stream, Galt, Ont., is designed as double culvert; constructed during winter to take advantage of lower costs.
New concrete bridge at Galt
Old Ainslie Street bridge replaced by specially designed concrete structure built in winter months. See also Contract Rec., vol. 40, no. 33, Aug. 18, 1926, pp. 780-781, 2 figs. New structure over mill stream, Galt, Ont., is designed as double culvert; constructed during winter to take advantage of lower costs.
New concrete bridge at Galt
Can. Engr
Canadian Engineer ; 51
1926
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reinforced concrete bridge at Galt, Ont.
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1950
|Die Sonderschau <> der SZFF an der Swissbau 01 galt der Niedrigenergiebauweise
British Library Online Contents | 2001
Engineering Index Backfile | 1894