A platform for research: civil engineering, architecture and urbanism
San Francisco bay crossing of hetch hetchy aqueduct
Methods used in laying flexible 42-in. pipe on channel bottom and in building bridge over shallows and large pier between channel and bridge sections.
San Francisco bay crossing of hetch hetchy aqueduct
Methods used in laying flexible 42-in. pipe on channel bottom and in building bridge over shallows and large pier between channel and bridge sections.
San Francisco bay crossing of hetch hetchy aqueduct
Eng. News-Rec
1926
5 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1920
Coast range tunnel of hetch hetchy aqueduct
Engineering Index Backfile | 1935
|Priest dam on Hetch Hetchy aqueduct
Engineering Index Backfile | 1934
|Construction progress on hetch hetchy aqueduct
Engineering Index Backfile | 1928
|The Coast Range Tunnel of the Hetch Hetchy Aqueduct
Wiley | 1935
|