A platform for research: civil engineering, architecture and urbanism
New techniques for difficult pile driving in surroundings where noise and vibration cannot be permitted in excess were used in construction of underpass at Croydon, England; underpass will be 48 ft wide internally, 1300 ft long, with slip roads on either side; test bores, piling, and drainage are described.
New techniques for difficult pile driving in surroundings where noise and vibration cannot be permitted in excess were used in construction of underpass at Croydon, England; underpass will be 48 ft wide internally, 1300 ft long, with slip roads on either side; test bores, piling, and drainage are described.
Novel piling method saved time on underpass
World Construction
Mead, H.T. (author)
World Construction ; 16
1963
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1953
UNDERPASS MONITORING SYSTEM, UNDERPASS MONITORING DEVICE, AND UNDERPASS MONITORING METHOD
European Patent Office | 2016
|Find out how careful piling has saved a church
British Library Online Contents | 2008
Quay change: A daring piling technique saved time on an Aberdeen port upgrade
British Library Online Contents | 2011
Engineering Index Backfile | 1940
|