A platform for research: civil engineering, architecture and urbanism
Essex trunk road scheme
New road will provide complete bypass to northwest of Brentwood, England; 500 ft diam elevated traffic circle forms first stage of 3 level intersection; concrete construction has been chosen for trunk road, while hot-rolled asphalt on lean concrete base and granular sub-base will be used on traffic circle and side and slip roads; bridges, culverts and retaining walls are briefly described.
Essex trunk road scheme
New road will provide complete bypass to northwest of Brentwood, England; 500 ft diam elevated traffic circle forms first stage of 3 level intersection; concrete construction has been chosen for trunk road, while hot-rolled asphalt on lean concrete base and granular sub-base will be used on traffic circle and side and slip roads; bridges, culverts and retaining walls are briefly described.
Essex trunk road scheme
Surveyor
Surveyor ; 123
1964
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1997
Online Contents | 1997
British Library Online Contents | 1996
|Tower Blocks UK: Islington London Essex Road and 294-300 Essex Road, l23-08.jpg
BASE | 2023
|Trunk road curves -- Road curves for dual highways
Engineering Index Backfile | 1939
|