A platform for research: civil engineering, architecture and urbanism
Never a dull moment for dirtmovers on Florida 'pike
Construction of 155-mi northward extension of Florida State Turnpike features new test that both designs and controls roadbed strength, and lime-rock treatment to build up soil strength in weak sections; excavating operations in difficult terrain, and equipment used are described.
Never a dull moment for dirtmovers on Florida 'pike
Construction of 155-mi northward extension of Florida State Turnpike features new test that both designs and controls roadbed strength, and lime-rock treatment to build up soil strength in weak sections; excavating operations in difficult terrain, and equipment used are described.
Never a dull moment for dirtmovers on Florida 'pike
Excavating Engr
Excavating Engineer ; 57
1963
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2013
|British Library Online Contents | 2013
|Online Contents | 2013
|Engineering Index Backfile | 1957
Editorial - Must Practical Mean Dull?
Online Contents | 1995