A platform for research: civil engineering, architecture and urbanism
Traveling crane and mobile forms speed big deck pours
Rolling forms and special crane were used for concreting 9500-yd deck on Texas underpass; individual pours involved slab sections 20 ft wide and 106 1/2 ft long; 140-ft main span of traveling crane bridges entire road cut.
Traveling crane and mobile forms speed big deck pours
Rolling forms and special crane were used for concreting 9500-yd deck on Texas underpass; individual pours involved slab sections 20 ft wide and 106 1/2 ft long; 140-ft main span of traveling crane bridges entire road cut.
Traveling crane and mobile forms speed big deck pours
Construction Methods Equipment
1964
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1957
Field Evaluation of Staged Concrete Bridge Deck Pours Adjacent to Live Traffic
British Library Online Contents | 2019
|British Library Online Contents | 1992
|Taylor & Francis Verlag | 1974