Three related articles on Le Havre port modernization
Construction of new 600 m passenger quay formed by 44 precast concrete caissons 11 m in diam; transporting, placing into position, and underholing operations are described in detail; materials handling equipment at tidal basin comprises four 15-ton unloading gantries, 2 reloading appliances of 1000 tph capacity, 2 appliances of same capacity for yard work, and other equipment, all interconnected with sets of conveyor belts.
Three related articles on Le Havre port modernization
Construction of new 600 m passenger quay formed by 44 precast concrete caissons 11 m in diam; transporting, placing into position, and underholing operations are described in detail; materials handling equipment at tidal basin comprises four 15-ton unloading gantries, 2 reloading appliances of 1000 tph capacity, 2 appliances of same capacity for yard work, and other equipment, all interconnected with sets of conveyor belts.
Three related articles on Le Havre port modernization
Le Havre
Deschenes, H. (author) / Giraudet, P. (author) / Toth, I. (author) / Vigue, L. (author)
Travaux ; 47
1963
24 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1933
Engineering Index Backfile | 1908
Engineering Index Backfile | 1910
|LE HAVRE PORT 2000 deuxième phase
Online Contents | 2010
Developing greater port of Havre
Engineering Index Backfile | 1934
|