A platform for research: civil engineering, architecture and urbanism
Dunkirk
6 related articles describing construction work on modernization of port and adaptation for handling very large mineral shipments; improvements include new 100 ha harbor basin protected by 2500 m long jetty, 4-berth quay for large mineral cargo carriers, high-speed equipment for ore unloading, stocking and reloading, 9 berths affording 13 m water depth, and new 20,000 ton floating dock; preparatory work on passing dock through canal lock.
Dunkirk
6 related articles describing construction work on modernization of port and adaptation for handling very large mineral shipments; improvements include new 100 ha harbor basin protected by 2500 m long jetty, 4-berth quay for large mineral cargo carriers, high-speed equipment for ore unloading, stocking and reloading, 9 berths affording 13 m water depth, and new 20,000 ton floating dock; preparatory work on passing dock through canal lock.
Dunkirk
Dunkerque
Guitonneau, R. (author) / Malegarie, H. (author) / Ribes, G. (author)
Travaux ; 47
1963
48 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1897
Dunkirk harbour extension works
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1921
Improvements at dunkirk harbour
Engineering Index Backfile | 1937
|British Library Online Contents | 1996