A platform for research: civil engineering, architecture and urbanism
Columbia gulf building nine compressor stations in 4-1/2 months
New system of construction requires only 3 construction crews to build 9 pipe line skid-mounted compressor stations; stations are built in sequence based on arrival dates of skid-mounted compressor from manufacturer; job schedule is same at each station which permits one construction crew to build several stations; prefabricating as much of station and its components as possible reduces amount of field work.
Columbia gulf building nine compressor stations in 4-1/2 months
New system of construction requires only 3 construction crews to build 9 pipe line skid-mounted compressor stations; stations are built in sequence based on arrival dates of skid-mounted compressor from manufacturer; job schedule is same at each station which permits one construction crew to build several stations; prefabricating as much of station and its components as possible reduces amount of field work.
Columbia gulf building nine compressor stations in 4-1/2 months
Oil Gas J
Bozeman, H.C. (author)
Oil and Gas Journal ; 62
1964
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Elsevier | 1984
|Bridgebuilder spans shifty border in nine months
Engineering Index Backfile | 1967
Nine months clyde shipbuilding -- Past work and prospects
Engineering Index Backfile | 1912
Production starts running again after just nine months
British Library Online Contents | 2009
Nine major highway projects in British Columbia
Engineering Index Backfile | 1944
|