A platform for research: civil engineering, architecture and urbanism
Kansas Turnpike, 236-mi toll super highway, required more than 12,000,000 tons of base materials and aggregates averaging nearly 52,000 tons per mi; over 75% of aggregates required supplied from plants, predominantly portable, operated by paving contractors and sub-contracting aggregate producers; turnpike planning; surfacing features and specifications.
Kansas Turnpike, 236-mi toll super highway, required more than 12,000,000 tons of base materials and aggregates averaging nearly 52,000 tons per mi; over 75% of aggregates required supplied from plants, predominantly portable, operated by paving contractors and sub-contracting aggregate producers; turnpike planning; surfacing features and specifications.
New Kansas Turnpike
Pit Quarry
Herod, B.C. (author)
Pit and Quarry ; 49
1956
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
Producing 1,500,000 tons for Kansas turnpike
Engineering Index Backfile | 1956
|Reconstruction of the Kansas Turnpike, Topeka to Kansas City
British Library Conference Proceedings | 1995
|Recycling is Theme of Kansas Turnpike Reconstruction
British Library Online Contents | 1997
Water and Sewage Facilities for the Kansas Turnpike
Wiley | 1958
|