A platform for research: civil engineering, architecture and urbanism
Ingenuity needed for bell caissons in loose sand
Foundation construction for 13-story building on steep hillside of loose sand; soil stabilized first with sodium silicate and bicarbonate of soda; drilling done with 10-ton rig going 175 ft deep with holes 1 to 8 ft in diam; belling bucket used if soil is firm; loose sand shaft is drilled and cased to top of bell; pipe lagging driven in at 60° angle; when pipes are in, casing is lowered; later casing is withdrawn as concrete level rises in shaft.
Ingenuity needed for bell caissons in loose sand
Foundation construction for 13-story building on steep hillside of loose sand; soil stabilized first with sodium silicate and bicarbonate of soda; drilling done with 10-ton rig going 175 ft deep with holes 1 to 8 ft in diam; belling bucket used if soil is firm; loose sand shaft is drilled and cased to top of bell; pipe lagging driven in at 60° angle; when pipes are in, casing is lowered; later casing is withdrawn as concrete level rises in shaft.
Ingenuity needed for bell caissons in loose sand
Western Construction
Western Construction ; 31
1956
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Installing long caissons in Mississippi calls for ingenuity
Engineering Index Backfile | 1965
Bell bottomed caissons anchor Detroit structure
Engineering Index Backfile | 1952
Extraction of suction caissons in sand
British Library Online Contents | 2014
|Sand Islands used to sink caissons
Engineering Index Backfile | 1955
|Performance of suction caissons in sand and clay
Online Contents | 2002
|