A platform for research: civil engineering, architecture and urbanism
Some hydraulic investigations in connexion with Wadi Tharthar project, Iraq
To project Baghdad and country to south from high floods in Tigris river, barrage is being constructed at Samarra to divert part of flood discharge of river into Wadi Tharthar depression; investigations into flood probabilities and river hydraulics before and after construction, also layout of headworks and river training measures proposed upstream. (See also - discussion p 352-65)
Some hydraulic investigations in connexion with Wadi Tharthar project, Iraq
To project Baghdad and country to south from high floods in Tigris river, barrage is being constructed at Samarra to divert part of flood discharge of river into Wadi Tharthar depression; investigations into flood probabilities and river hydraulics before and after construction, also layout of headworks and river training measures proposed upstream. (See also - discussion p 352-65)
Some hydraulic investigations in connexion with Wadi Tharthar project, Iraq
Instn Civ Engrs -- Proc
Thomas, A.R. (author)
1956
27 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Projekt Wadi Tharthar : Ingenieure bändigen den Tigris
TIBKAT | 1958
|Delta Project: Hydraulic Investigations
ASCE | 2021
|Hydraulic investigations for Delta project
Engineering Index Backfile | 1959
|British Library Conference Proceedings | 1994
|