A platform for research: civil engineering, architecture and urbanism
Teamwork keeps job on fast schedule
Some of constructional problems and engineering features of $ 35 million New York Coliseum, designed to provide 300,000 sq ft of exhibition space in four floors; entire project includes exhibition building, 20-story office tower and 2-level basement garage; structural oddities, general erection plan and other job aspects.
Teamwork keeps job on fast schedule
Some of constructional problems and engineering features of $ 35 million New York Coliseum, designed to provide 300,000 sq ft of exhibition space in four floors; entire project includes exhibition building, 20-story office tower and 2-level basement garage; structural oddities, general erection plan and other job aspects.
Teamwork keeps job on fast schedule
Eng News-Rec
Engineering News-Record ; 156
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Precast retaining wall keeps freeway on schedule
Engineering Index Backfile | 1964
|Case study: How one port keeps its busy waterway open through its dredging schedule
British Library Online Contents | 2007
Online Contents | 2013
|CONCRETE PUMPING - A new home for the Grizzlies - Pumping keeps to schedule in Memphis
Online Contents | 2003
Cover Story: Teamwork ensures fast-track project success
British Library Online Contents | 2009