A platform for research: civil engineering, architecture and urbanism
Methods for wiring lift-slabs
Techniques for anchoring outlets and maintaining raceway continuity in construction of Woodrow Wilson High School, Portland, Ore; in lift slab construction all concrete floors are poured at ground level and raised to desired height.
Methods for wiring lift-slabs
Techniques for anchoring outlets and maintaining raceway continuity in construction of Woodrow Wilson High School, Portland, Ore; in lift slab construction all concrete floors are poured at ground level and raised to desired height.
Methods for wiring lift-slabs
Elec Construction Maintenance
1956
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed lift slabs withstand fire
Engineering Index Backfile | 1965
|Engineering Index Backfile | 1954
Notes on post-tensioned lift-slabs
Engineering Index Backfile | 1965
|Prestressed lift-slabs in club building
Engineering Index Backfile | 1963
|Automatic Jacks Raise Record Lift-Slabs
Engineering Index Backfile | 1960