A platform for research: civil engineering, architecture and urbanism
Excavation and hauling procedures in construction of San Antonio flood control dam near Claremont; dam will control runoff from 26.7 sq mi area; designed as earth fill structure, it is 3850 ft long at crest and rises 160 ft above streambed; double spotting loading arrangement used.
Excavation and hauling procedures in construction of San Antonio flood control dam near Claremont; dam will control runoff from 26.7 sq mi area; designed as earth fill structure, it is 3850 ft long at crest and rises 160 ft above streambed; double spotting loading arrangement used.
California's newest dam
Excavating Engr
Day, R. (author)
Excavating Engineer ; 50
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1898
|California's antisprawl solution
British Library Online Contents | 2005
|UB Braunschweig | 1984
|TIBKAT | 1984
|