A platform for research: civil engineering, architecture and urbanism
Measures taken to prevent leaks and to improve appearance of concrete dam walls at Trawsfynydd reservoir; surface cleaned and hacked; 4 in. × 4 in. × 8 gage steel fabric reinforcement fixed to face; application of gunite facing 1 1/2 in. thick; cracks opened and plugged with mastic bitumen; analysis of defects; recommendations for facings. (See also - n 595 Jan 1956 p 79-82, n 596 Feb p 196-8; Water and Water Eng v 60 n 719 Jan 1956 p 12-22)
Measures taken to prevent leaks and to improve appearance of concrete dam walls at Trawsfynydd reservoir; surface cleaned and hacked; 4 in. × 4 in. × 8 gage steel fabric reinforcement fixed to face; application of gunite facing 1 1/2 in. thick; cracks opened and plugged with mastic bitumen; analysis of defects; recommendations for facings. (See also - n 595 Jan 1956 p 79-82, n 596 Feb p 196-8; Water and Water Eng v 60 n 719 Jan 1956 p 12-22)
Refacing of four concrete dams
Civ Eng (Lond)
Ternan, W.G.M. (author)
Civil Engineering ; 51
1956
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Refacing of four concrete dams
Engineering Index Backfile | 1956
|Refacing dam with precast concrete slabs
Engineering Index Backfile | 1948
Refacing dam with precast concrete slabs
Engineering Index Backfile | 1949
Engineering Index Backfile | 1939
Engineering Index Backfile | 1911
|