A platform for research: civil engineering, architecture and urbanism
South channel of St. Lawrence River, plugged with rock-filled timber crib and sled arrangement, to cut off flow and permit construction of conventional steel sheet pile cellular cofferdam; sled formed by three runners of 24-in. WF 100-lb steel beams; river flow diverted and still water created.
South channel of St. Lawrence River, plugged with rock-filled timber crib and sled arrangement, to cut off flow and permit construction of conventional steel sheet pile cellular cofferdam; sled formed by three runners of 24-in. WF 100-lb steel beams; river flow diverted and still water created.
Crib-sled nicely does trick
Eng News-Rec
Weidner, E.L. (author)
Engineering News-Record ; 156
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.