A platform for research: civil engineering, architecture and urbanism
Reconstruction of Gallions Lock Entrance; dams at both ends and deep well groundwater lowering system around area were required to increase effective locking depth by altering lock bottom; other work included various repair and improvements, new gates, replacement of sides of curved invert by reinforced concrete knees, etc.
Reconstruction of Gallions Lock Entrance; dams at both ends and deep well groundwater lowering system around area were required to increase effective locking depth by altering lock bottom; other work included various repair and improvements, new gates, replacement of sides of curved invert by reinforced concrete knees, etc.
Royal Group of Docks, Port of London
Dock Harbour Authority
Spear, G.L. (author)
1956
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
London. Improvements at Royal Docks, Port of London Authority
Engineering Index Backfile | 1939
|London. Improvements at Royal Docks, Port of London Authority
Engineering Index Backfile | 1939
|Royal docks approaches improvement, London
Engineering Index Backfile | 1936
|Royal docks approaches improvement, London
Engineering Index Backfile | 1936
|The Development of the Royal Docks, London
British Library Conference Proceedings | 1995
|