First top out building -- Then complete foundation
Procedure used in bracing perilously unstable four-story brick party wall while underpinning it 14 ft during construction of parking garage in Washington, DC; temporary steel column bents support ends of second floor girders near party wall and carry all floors from second to roof; steel bents were placed at angle; when concrete columns were built up, steel columns were removed.
First top out building -- Then complete foundation
Procedure used in bracing perilously unstable four-story brick party wall while underpinning it 14 ft during construction of parking garage in Washington, DC; temporary steel column bents support ends of second floor girders near party wall and carry all floors from second to roof; steel bents were placed at angle; when concrete columns were built up, steel columns were removed.
First top out building -- Then complete foundation
Construction Methods Equipment
Humphreys, C.W. (author)
1956
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
First Criticism, Then Building
Online Contents | 2009
|First Criticism, Then Building
Taylor & Francis Verlag | 2009
|First Criticism, Then Building
British Library Online Contents | 2009
|Building foundation through foundation
Engineering Index Backfile | 1958
|