A platform for research: civil engineering, architecture and urbanism
Pulling bridge together
Endwise shift method used by Chilean State Railways for erecting continuous truss type bridge to replace 70-yr old span across Maule river; two sections, each 722 ft long were constructed on opposite banks; sections were moved on dollies over narrow gage track laid under each truss and extending on falsework. (See also Ry Age v 141 n 1 July 2 1956 p 32-3; Ry Gaz v 105 n 14 Oct 5 1956 p 412-3)
Pulling bridge together
Endwise shift method used by Chilean State Railways for erecting continuous truss type bridge to replace 70-yr old span across Maule river; two sections, each 722 ft long were constructed on opposite banks; sections were moved on dollies over narrow gage track laid under each truss and extending on falsework. (See also Ry Age v 141 n 1 July 2 1956 p 32-3; Ry Gaz v 105 n 14 Oct 5 1956 p 412-3)
Pulling bridge together
Ry Track Structures
1956
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
Engineering Index Backfile | 1956
Pulling it all Together With Integrated Specifications
Online Contents | 1996
Pulling together: River and rowing museum, Henley, England
British Library Online Contents | 1997
|