A platform for research: civil engineering, architecture and urbanism
Want to lift 3,000-ton bridge? House mover shows how it's done
3000-ton reinforced concrete bridge jacked 13 ft to new grade in Berkeley, Calif; existing structure pivoted on temporary hinge cut into concrete bridge deck; two hydraulic jacks placed at end column of section to be lifted; jacks positioned on two steel plates, with steel rollers in between.
Want to lift 3,000-ton bridge? House mover shows how it's done
3000-ton reinforced concrete bridge jacked 13 ft to new grade in Berkeley, Calif; existing structure pivoted on temporary hinge cut into concrete bridge deck; two hydraulic jacks placed at end column of section to be lifted; jacks positioned on two steel plates, with steel rollers in between.
Want to lift 3,000-ton bridge? House mover shows how it's done
Western Construction
Western Construction ; 31
1956
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Alameda Corridor shows how it's done
IuD Bahn | 2002
|Engineering Index Backfile | 1905
|Engineering Index Backfile | 1905
|Seeing Is Believing - Dual-rotary demonstration shows how it's done
Online Contents | 2003
British Library Online Contents | 2007