A platform for research: civil engineering, architecture and urbanism
Structure, entirely of concrete, consists of ten 30-ft precast prestressed spans on west and 18 similar spans on east of central 105-ft span also precast and prestressed by post tensioning method; it is founded on 26 precast prestressed concrete pile bents, two composite steel and concrete abutments with two center concrete piers on untreated timber foundation piles. (See also Calif Highways and Public Works v 35 n 9, 10 Sept-Oct 1956 p 9-11, 43)
Structure, entirely of concrete, consists of ten 30-ft precast prestressed spans on west and 18 similar spans on east of central 105-ft span also precast and prestressed by post tensioning method; it is founded on 26 precast prestressed concrete pile bents, two composite steel and concrete abutments with two center concrete piers on untreated timber foundation piles. (See also Calif Highways and Public Works v 35 n 9, 10 Sept-Oct 1956 p 9-11, 43)
Eureka slough bridge
Western Construction
Kay, A.F. (author)
Western Construction ; 31
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
|Rehabilitation of the Deas Slough Bridge
British Library Conference Proceedings | 1990
|CSX Bridge over Tennessee River Slough
British Library Online Contents | 2000
Online Contents | 2000
|