A platform for research: civil engineering, architecture and urbanism
Reconstruction of bascule bridge at Zelzate (Belgium)
New structure has movable span of 138 ft; structural steel work; counterweights; segments and rolling tracks; electrical and mechanical equipment; approach span; access footbridges to movable span.
Reconstruction of bascule bridge at Zelzate (Belgium)
New structure has movable span of 138 ft; structural steel work; counterweights; segments and rolling tracks; electrical and mechanical equipment; approach span; access footbridges to movable span.
Reconstruction of bascule bridge at Zelzate (Belgium)
Acier Stahl Steel
de Smet, R. (author)
Acier-Stahl-Steel ; 21
1956
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Congress Street Bascule Bridge Reconstruction
ASCE | 2012
|Congress Street Bascule Bridge Reconstruction
British Library Conference Proceedings | 2012
|Piston Stayed Bascule Bridge: a Novel Mobile Bridge Typology at Temse, Belgium
British Library Conference Proceedings | 2008
|Engineering Index Backfile | 1896