A platform for research: civil engineering, architecture and urbanism
Skilled bridge builders conquer "old man river"
Difficult problems involved in construction of 3-span cantilever bridge at New Orleans; methods adopted for deep pier foundations; recent changes in practice in pier construction; costs of compressed air; controlling caisson location; sinking pier; elevation minus 72; caisson mooring stall; sinking into mud. (See also Civ Eng v 26 n 2 Feb 1956 p 40-4, 104; World Construction v 9 n 3 Mar 1956 p 20, 24, 26-8, 30, 32, 36)
Skilled bridge builders conquer "old man river"
Difficult problems involved in construction of 3-span cantilever bridge at New Orleans; methods adopted for deep pier foundations; recent changes in practice in pier construction; costs of compressed air; controlling caisson location; sinking pier; elevation minus 72; caisson mooring stall; sinking into mud. (See also Civ Eng v 26 n 2 Feb 1956 p 40-4, 104; World Construction v 9 n 3 Mar 1956 p 20, 24, 26-8, 30, 32, 36)
Skilled bridge builders conquer "old man river"
Construction Methods Equipment
Smith, A.C. (author)
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Skilled bridge builders conquer "old man river"
Engineering Index Backfile | 1956
|Skilled bridge builders conquer "old man river"
Engineering Index Backfile | 1956
|TIBKAT | 2002
|Construction canals serve builders of Neches River Bridge
Engineering Index Backfile | 1938
Challenging problems beset builders of bridge river project
Engineering Index Backfile | 1959