A platform for research: civil engineering, architecture and urbanism
Methods and cost of constructing a concrete sewer in freezing weather
Describes work at Fond-du-Lac, Wis., during Nov. and Dec., 1908, with the thermometer ranging from 15 degrees below zero, to the freezing point. (1500 w.) (No. 2142)
Methods and cost of constructing a concrete sewer in freezing weather
Describes work at Fond-du-Lac, Wis., during Nov. and Dec., 1908, with the thermometer ranging from 15 degrees below zero, to the freezing point. (1500 w.) (No. 2142)
Methods and cost of constructing a concrete sewer in freezing weather
Engng-Con
1909
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Method of constructing concrete road in freezing weather
Engineering Index Backfile | 1915
|Methods and cost of constructing a large reinforced concrete sewer at St. Louis, Mo
Engineering Index Backfile | 1907
Constructing a large concrete sewer at Chicago
Engineering Index Backfile | 1915
Methods and cost of constructing a concrete sewer having a brick arch, at Medford, Mass
Engineering Index Backfile | 1903
Constructing a concrete storm sewer at Montgomery, Ala
Engineering Index Backfile | 1911
|