Handling complete bridge spans
Illustrates and describes work on the Lehigh and New England in which the spans were assembled off the bridge, then brought into position over the old truss and hung from gallows frames. The old truss was then removed and the new truss lowered into position. (1200 w.) (No. 3097)
Handling complete bridge spans
Illustrates and describes work on the Lehigh and New England in which the spans were assembled off the bridge, then brought into position over the old truss and hung from gallows frames. The old truss was then removed and the new truss lowered into position. (1200 w.) (No. 3097)
Handling complete bridge spans
R R Age Gaz
1909
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Merchants Bridge spans history
British Library Online Contents | 1995
|Long spans give handling problem
Engineering Index Backfile | 1959
Engineering Index Backfile | 1942
Engineering Index Backfile | 1942
Kenova bridge intermediate spans
Engineering Index Backfile | 1920