A platform for research: civil engineering, architecture and urbanism
Madeleine bridge over Loire, near Nantes, consisting of three arches 45 to 67 m. in span; grouting operations made necessary by imperfect concreting which became apparent right after completion of construction.
Madeleine bridge over Loire, near Nantes, consisting of three arches 45 to 67 m. in span; grouting operations made necessary by imperfect concreting which became apparent right after completion of construction.
Repairing arches of reinforced-concrete bridge by grouting process
Reparation aux arcs d'un pont en beton arme par la methode des injections
Lazard (author)
1931
20 pages
16 Figs.
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Grouting construction process for optimizing bridge crack repairing effect
European Patent Office | 2022
|