A platform for research: civil engineering, architecture and urbanism
Hydraulic works of ebro basin
Barasona Reservoir, built to regulate supply for Aragon and Catalunya canal, which derives from Esera River 2 1/2 km. downstream; gravity dam of triangular section, calculated by Pigeaud method and built of concrete blocks; dam 55 m. high, 62 m. long and 4 m. wide on crest; impounds 71 million cu. ft.; total cost of project 12,500,000 pesetas; in addition to use for irrigation, hydroelectric plant is projected.
Hydraulic works of ebro basin
Barasona Reservoir, built to regulate supply for Aragon and Catalunya canal, which derives from Esera River 2 1/2 km. downstream; gravity dam of triangular section, calculated by Pigeaud method and built of concrete blocks; dam 55 m. high, 62 m. long and 4 m. wide on crest; impounds 71 million cu. ft.; total cost of project 12,500,000 pesetas; in addition to use for irrigation, hydroelectric plant is projected.
Hydraulic works of ebro basin
Las obras hidraulicas de la Cuenca del Ebro
DeFuentes Lopez, L. (author)
1931
4 pages
4 Figs.
Article (Journal)
Spanish
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1931
|RCC dams in Spain's Ebro basin
Online Contents | 2012
|Groundwater in the Central Sector of the Ebro Basin
Online Contents | 2007
|Occurrence of sulfonamide residues along the Ebro river basin
Online Contents | 2011
|