A platform for research: civil engineering, architecture and urbanism
Rosenstein and Wilhelm bridges over the neckar at Stuttgart-Cannstatt
Two steel girder highway bridges made necessary by canalization of Neckar; bridges have clear span length of 69 m.; Wilhelm bridge is designed as two-hinged frame. (See also - no. 18-19 May 1, 1931, pp. 327-331)
Rosenstein and Wilhelm bridges over the neckar at Stuttgart-Cannstatt
Two steel girder highway bridges made necessary by canalization of Neckar; bridges have clear span length of 69 m.; Wilhelm bridge is designed as two-hinged frame. (See also - no. 18-19 May 1, 1931, pp. 327-331)
Rosenstein and Wilhelm bridges over the neckar at Stuttgart-Cannstatt
Die Rosenstein und die Wilhelmsbruecke ueber den Neckar bei Stuttgart-Cannstatt
Burkhardt, E. (author)
Bauingenieur ; 12
1931
3 pages
14 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Blasting of Wilhelm Bridge over the Neckar at Stuttgart-Cannstatt
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1914
|Cannstatt-Stuttgart mineral springs
Engineering Index Backfile | 1930
|Wettbewerb Hauptfriedhof Stuttgart-Cannstatt
DataCite | 1913
|