A platform for research: civil engineering, architecture and urbanism
Reconstruction of district highway bridge over danube at grossmehring
New reinforced-concrete girder bridge having total length of 145 m., max. span of 61.5 m.; total width 6 1/2 m.; reinforcement details.
Reconstruction of district highway bridge over danube at grossmehring
New reinforced-concrete girder bridge having total length of 145 m., max. span of 61.5 m.; total width 6 1/2 m.; reinforcement details.
Reconstruction of district highway bridge over danube at grossmehring
Der Neubau der Bezirksstrassenbruecke ueber die Donau bei Grossmehring
Boerner, H. (author)
Bauingenieur ; 12
1931
6 pages
13 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Highway bridge over the Danube at Novi-Sad
Engineering Index Backfile | 1928
|Highway bridge over the Danube at Novi-Sad
Engineering Index Backfile | 1928
|Reconstruction of federal highway bridges over Danube River, Austria
Engineering Index Backfile | 1951
|The francis joseph highway bridge over the danube at Budapest
Engineering Index Backfile | 1898
Dynamic Tests and Monitoring of a Highway Bridge over the Danube
British Library Conference Proceedings | 1998
|