A platform for research: civil engineering, architecture and urbanism
Ontario hydro's new 54,000 hp.Nipigon river development
Development will have initial capacity of three 18,000-hp. units, operating under net head of 60 ft.; description of site chosen; earth-fill dam of semi-hydraulic type to be built across river, will have maximum height of 80 ft. above bed of river and total crest length of 1110 ft. (See also Elec. News vol. 37, no. 18, Sept. 15, 1928 pp. 33-34, 3 figs)
Ontario hydro's new 54,000 hp.Nipigon river development
Development will have initial capacity of three 18,000-hp. units, operating under net head of 60 ft.; description of site chosen; earth-fill dam of semi-hydraulic type to be built across river, will have maximum height of 80 ft. above bed of river and total crest length of 1110 ft. (See also Elec. News vol. 37, no. 18, Sept. 15, 1928 pp. 33-34, 3 figs)
Ontario hydro's new 54,000 hp.Nipigon river development
Contract Rec
1928
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ontario hydro's new 54,000 hp.Nipigon river development
Engineering Index Backfile | 1928
Ontario Hydro's new business strategy
Online Contents | 1994
Performance of Roller Compacted Concrete - Ontario Hydro's Experience
British Library Conference Proceedings | 1998
|Recent Developments in Ontario Hydro's Emergency Preparedness Plan Program
British Library Conference Proceedings | 1996
|Bedrock Gypsum Dissolution Studies at Ontario Hydro's R.H. Saunders G.S.
British Library Conference Proceedings | 1990
|