A platform for research: civil engineering, architecture and urbanism
Hydro-electric models eliminate design guesswork
Hydraulic laboratory of Alabama Power Co. investigates nature of factors otherwise indeterminate; miniature scaled structures are prepared in detail for each development; several interesting problems were worked out satisfactorily by means of small-scale model before Martin Dam was constructed.
Hydro-electric models eliminate design guesswork
Hydraulic laboratory of Alabama Power Co. investigates nature of factors otherwise indeterminate; miniature scaled structures are prepared in detail for each development; several interesting problems were worked out satisfactorily by means of small-scale model before Martin Dam was constructed.
Hydro-electric models eliminate design guesswork
Elec. World
Electrical World ; 92
1928
2 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Eliminating the Guesswork in Connection Design
British Library Conference Proceedings | 1992
|System Takes the Guesswork Out of Pretreatment
British Library Online Contents | 1997
Taking the guesswork out of water leakage
Engineering Index Backfile | 1923
|Eliminating the Guesswork in connection Design - The Role of the Design Engineer
British Library Conference Proceedings | 1992
|