A platform for research: civil engineering, architecture and urbanism
Order of work; building segment-block drains; manufacture of reinforced-concrete pipe; excavating for and laying reinforced-concrete pipe; 108-in. monolithic concrete section; 84-x 108-in. reinforced-concrete section.
Order of work; building segment-block drains; manufacture of reinforced-concrete pipe; excavating for and laying reinforced-concrete pipe; 108-in. monolithic concrete section; 84-x 108-in. reinforced-concrete section.
Constructing 2 1/2 miles of storm water drain
Contractors' Engrs.' Monthly
Bonney, O. (author)
1928
6 pages
14 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.