A platform for research: civil engineering, architecture and urbanism
Jacking culvert through railway fill aided by top shield
Top shield and trial of novel (though unsuccessful) method of reinforcing anchorage for pushing jack were interesting points in driving of pipe culvert through fill of Davenport, Rock Island and North Western Railway; purpose was to drain slough where storm-water from city drains was impounded by railway fill, which was built on 6-ft. bed of mud or silt.
Jacking culvert through railway fill aided by top shield
Top shield and trial of novel (though unsuccessful) method of reinforcing anchorage for pushing jack were interesting points in driving of pipe culvert through fill of Davenport, Rock Island and North Western Railway; purpose was to drain slough where storm-water from city drains was impounded by railway fill, which was built on 6-ft. bed of mud or silt.
Jacking culvert through railway fill aided by top shield
Eng. News-Rec
Tunnicliff, N.H. (author)
Engineering News Record ; 101
1928
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Railway underneath pass box culvert jacking rail reinforcing method
European Patent Office | 2021
|Jacking a culvert through a rock ledge
Engineering Index Backfile | 1928
Engineering Index Backfile | 1937
|Jacking culvert through embankment cuts cost two-thirds
Engineering Index Backfile | 1926
|