A platform for research: civil engineering, architecture and urbanism
Moving 63,000,000 cubic yards for Welland chip canal
New Welland Ship Canal now 80 per cent completed; to be finished in 1930; total cost estimated as $115,000,000; four relocations in 100 years; canal to take vessels of 25-ft. draft; siphon culvert carries Chippewa Creek under canal; unique fastening of discharge pipes; dewatering a problem.
Moving 63,000,000 cubic yards for Welland chip canal
New Welland Ship Canal now 80 per cent completed; to be finished in 1930; total cost estimated as $115,000,000; four relocations in 100 years; canal to take vessels of 25-ft. draft; siphon culvert carries Chippewa Creek under canal; unique fastening of discharge pipes; dewatering a problem.
Moving 63,000,000 cubic yards for Welland chip canal
Excavating Engr.
Excavating Engineer ; 22
1928
11 pages
36 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1958
|Engineering Index Backfile | 1957
|ASCE | 2021
|Engineering Index Backfile | 1932
|Engineering Index Backfile | 1931