A platform for research: civil engineering, architecture and urbanism
Operating equipment and construction of the Fuerstenberg canal locks
Details of equipment for operation of gates and sluices, moorings and towing facilities; features of construction, procedure and construction plant.
Operating equipment and construction of the Fuerstenberg canal locks
Details of equipment for operation of gates and sluices, moorings and towing facilities; features of construction, procedure and construction plant.
Operating equipment and construction of the Fuerstenberg canal locks
Betriebseinrichtungen und Bau der Fuerstenberger Schleuse
Moeller, E. (author)
V.D.I. Zeitschrift ; 72
1928
4 pages
9 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of twin canal locks at Fuerstenberg on the Oder
Engineering Index Backfile | 1928
|Groundwater control in construction of twin shaft locks at fuerstenberg on the oder
Engineering Index Backfile | 1928
|Construction of last stretch of oder-spree canal at fuerstenberg on the oder
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1878