A platform for research: civil engineering, architecture and urbanism
Electric-arc welding
Fifty-ft. high building consisting of 78 by 171-ft. head house or transept and two main aisles 474 ft. long and 59 and 79 ft. wide respectively; saving of from 12 to 15 per cent in tonnage of steel required; design; roof trusses; welding process; shop fabrication.
Electric-arc welding
Fifty-ft. high building consisting of 78 by 171-ft. head house or transept and two main aisles 474 ft. long and 59 and 79 ft. wide respectively; saving of from 12 to 15 per cent in tonnage of steel required; design; roof trusses; welding process; shop fabrication.
Electric-arc welding
Constr. Methods
Construction Methods ; 10
1928
4 pages
12 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1919
Electric welding of structural steel
Engineering Index Backfile | 1928
Electric welding in steel construction
Engineering Index Backfile | 1928
|Electric welding on ship-board
Engineering Index Backfile | 1890