A platform for research: civil engineering, architecture and urbanism
Complex concrete building designed for quick construction
Eleven floors, 20,000 sq. ft. each, of 12-story concrete building were poured in 44 days in building Cambridge apartments at Germantown, Pa.; standardized design, equal column spacing, method of pouring columns, joist and tile floor construction, uniform beam sections, and few changes in column sizes, cut down construction time; columns cast separately ahead of floor slabs; tower and carriage for concreting columns.
Complex concrete building designed for quick construction
Eleven floors, 20,000 sq. ft. each, of 12-story concrete building were poured in 44 days in building Cambridge apartments at Germantown, Pa.; standardized design, equal column spacing, method of pouring columns, joist and tile floor construction, uniform beam sections, and few changes in column sizes, cut down construction time; columns cast separately ahead of floor slabs; tower and carriage for concreting columns.
Complex concrete building designed for quick construction
Eng. News-Rec.
Hebold, D. (author)
Engineering News Record ; 101
1928
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
"Q" in quick building construction
Engineering Index Backfile | 1944
|Quick-to-assemble building template for building construction
European Patent Office | 2024
|Quick construction device and construction method for precast concrete
European Patent Office | 2024
|Quick pouring and construction structure for plant building
European Patent Office | 2023
|