A platform for research: civil engineering, architecture and urbanism
Simple expedient solves problem in bridge erection
Raising of track grades reduces sag in line and makes room for new girders above tops of old trusses; method of erection; entire new structure was placed and old structure removed without resorting to falsework, and no rolling or sliding operations were involved; structure comprises crossing of Muscatatuck creek at Lovett, Ind., on Baltimore and Ohio line.
Simple expedient solves problem in bridge erection
Raising of track grades reduces sag in line and makes room for new girders above tops of old trusses; method of erection; entire new structure was placed and old structure removed without resorting to falsework, and no rolling or sliding operations were involved; structure comprises crossing of Muscatatuck creek at Lovett, Ind., on Baltimore and Ohio line.
Simple expedient solves problem in bridge erection
Ry. Eng. Maintenance
Lang, Jr., P.G. (author)
1928
3 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1898
|Engineering Index Backfile | 1933
|Erection of Columbia River Bridge erection
Engineering Index Backfile | 1894
BRIDGE ERECTION METHOD AND LAUNCHING MACHINE FOR BRIDGE ERECTION
European Patent Office | 2022
|