A platform for research: civil engineering, architecture and urbanism
Consists of four 75-ft. steel deck-truss spans and two 252-ft. through truss spans, all resting on abutments and round nosed piers of reinforced concrete carried to bedrock foundation; construction; cofferdam for pier 5; bridge completed rapidly.
Consists of four 75-ft. steel deck-truss spans and two 252-ft. through truss spans, all resting on abutments and round nosed piers of reinforced concrete carried to bedrock foundation; construction; cofferdam for pier 5; bridge completed rapidly.
The Pecos river bridge project
Contractors Engrs. Monthly
Bennett, R.W. (author)
1928
4 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1892
Engineering Index Backfile | 1892
New pecos river bridge has high piers
Engineering Index Backfile | 1945
Pecos River joint investigation
Engineering Index Backfile | 1940
|NTIS | 1994