A platform for research: civil engineering, architecture and urbanism
The Arlington memorial bridge
Construction will be reinforced concrete faced with granite; whole project will not be complete for seven or eight years.
The Arlington memorial bridge
Construction will be reinforced concrete faced with granite; whole project will not be complete for seven or eight years.
The Arlington memorial bridge
Mfrs. Rec
1928
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Draw span of Arlington memorial bridge
Engineering Index Backfile | 1930
|Construction features of the Arlington memorial bridge
Engineering Index Backfile | 1928
|Sheet pile cofferdams for the Arlington memorial bridge
Engineering Index Backfile | 1928