A platform for research: civil engineering, architecture and urbanism
Highway bridge across Susquehanna River at Conowingo, Md.; seven spans to be demolished, totaling 1316 feet; Du Pont blasting gelatin was explosive used; preliminary test; location of charges; no formula was used to compute charges; on average, those actually used were about 3/4 lb. of blasting gelatin for each square inch of cross-section.
Highway bridge across Susquehanna River at Conowingo, Md.; seven spans to be demolished, totaling 1316 feet; Du Pont blasting gelatin was explosive used; preliminary test; location of charges; no formula was used to compute charges; on average, those actually used were about 3/4 lb. of blasting gelatin for each square inch of cross-section.
Demolition of a steel highway bridge
Military Engr
Troland, G.B. (author)
Military Engineer ; 20
1928
2 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fundamentals of Highway Bridge Demolition
British Library Conference Proceedings | 2013
|Fundamentals of Highway Bridge Demolition
ASCE | 2013
|ACCELERATING HIGHWAY BRIDGE DEMOLITION - AN INNOVATIVE APPROACH
British Library Conference Proceedings | 2005
|Bridge demolition breaking hammer and bridge demolition equipment
European Patent Office | 2020
|