A platform for research: civil engineering, architecture and urbanism
Facing a 90 ft. Cut with concrete, liberty bridge, Pittsburgh
Slope wall for bridge approach built between gravity walls at toe and crest; elaborate system of pipe drains and weep holes provided; ready mixed concrete used; excavation of 185,000 cu. yd. of earth and rock and placing of 10,000 cu. yd. of concrete.
Facing a 90 ft. Cut with concrete, liberty bridge, Pittsburgh
Slope wall for bridge approach built between gravity walls at toe and crest; elaborate system of pipe drains and weep holes provided; ready mixed concrete used; excavation of 185,000 cu. yd. of earth and rock and placing of 10,000 cu. yd. of concrete.
Facing a 90 ft. Cut with concrete, liberty bridge, Pittsburgh
Eng. News-Rec
Harvey, C.K. (author)
Engineering News Record ; 101
1928
3 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Liberty Tunnel Interchange Pittsburgh
British Library Online Contents | 2002
Liberty tunnel fan house, Pittsburgh, Pa
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1948
Atherton avenue highway bridge, Pittsburgh
Engineering Index Backfile | 1913