A platform for research: civil engineering, architecture and urbanism
Unusual resourcefulness marks erection of temporary bridge after Vermont flood
Describes bridge near Middlesex, Vt.; by utilizing resources of locality, temporary crossing of unique design was built in record time; securing materials difficult; method of construction; swinging poles.
Unusual resourcefulness marks erection of temporary bridge after Vermont flood
Describes bridge near Middlesex, Vt.; by utilizing resources of locality, temporary crossing of unique design was built in record time; securing materials difficult; method of construction; swinging poles.
Unusual resourcefulness marks erection of temporary bridge after Vermont flood
Highway Mag
Highway Magazine ; 19
1928
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1954
|Staging and temporary erection of the Sukkur cantilever bridge at the bridge works
Engineering Index Backfile | 1888
|Reliability during temporary erection conditions
British Library Conference Proceedings | 1996
|Unusual girder contour marks new concrete bridge
Engineering Index Backfile | 1932
|