A platform for research: civil engineering, architecture and urbanism
The valley bridge, Scarborough
Notes on reconstruction of bridge originally completed in 1865; new bridge consists of 4 spans of 150 ft. each and provides roadway 40 ft. wide with two footwalks each 12 ft. 3 in. wide; details of construction work.
The valley bridge, Scarborough
Notes on reconstruction of bridge originally completed in 1865; new bridge consists of 4 spans of 150 ft. each and provides roadway 40 ft. wide with two footwalks each 12 ft. 3 in. wide; details of construction work.
The valley bridge, Scarborough
Engineer
Engineer ; 146
1928
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
"Scarborough valley bridge reconstruction,"
Engineering Index Backfile | 1929
|The new valley bridge at Scarborough
Engineering Index Backfile | 1928
The New Valley Bridge at Scarborough
Engineering Index Backfile | 1928
Engineering Index Backfile | 1887
Providence Centre. Scarborough, Ontario
Online Contents | 1997
|