A platform for research: civil engineering, architecture and urbanism
Very brief discussion giving statistics for steel construction; total for all classes of work exceeded $7,000,000,000 as it did in 1926; outlook is for continuance of high rate of building; latter half of last year showed greater activity than first half; reflected in domain of public works and in private work other than buildings; gain in every class except water works; greatest gain in bridges explained; coincident with rapid increase in construction volume, strong increase in credits.
Very brief discussion giving statistics for steel construction; total for all classes of work exceeded $7,000,000,000 as it did in 1926; outlook is for continuance of high rate of building; latter half of last year showed greater activity than first half; reflected in domain of public works and in private work other than buildings; gain in every class except water works; greatest gain in bridges explained; coincident with rapid increase in construction volume, strong increase in credits.
Bridge construction gained 70 per cent
Iron Age
Welch, A.W. (author)
Iron Age ; 120
1928
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Experience gained from recent steel bridge construction in French Switzerland
Engineering Index Backfile | 1964
|Experience Gained in the Messina Bridge Aeroelastic Project
British Library Conference Proceedings | 1999
|114 Per cent increase in construction accidents
Engineering Index Backfile | 1929
Construction of signaling advanced 9.5 per cent
Engineering Index Backfile | 1947
Experienced Gained and Lessons Learned from an Extensive Bridge Monitoring Research Project
British Library Conference Proceedings | 2008
|