A platform for research: civil engineering, architecture and urbanism
Design and construction of the Atlantic City convention hall
Building is 350 ft. wide and had average depth of 662 1/2 ft. occuping entire block; foundation built on 20,000 piles 30 ft. long with minimum butt of 12 in.; excavation of boiler room; attention is called to end walls of auditorium; top support of wall column was provided with sliding connection to bottom chord of end trusses.
Design and construction of the Atlantic City convention hall
Building is 350 ft. wide and had average depth of 662 1/2 ft. occuping entire block; foundation built on 20,000 piles 30 ft. long with minimum butt of 12 in.; excavation of boiler room; attention is called to end walls of auditorium; top support of wall column was provided with sliding connection to bottom chord of end trusses.
Design and construction of the Atlantic City convention hall
Boston Soc. Civ. Engrs. -- Jl
Ware, S.L. (author)
1928
7 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Atlantic City convention hall
Engineering Index Backfile | 1929
|The Atlantic City convention hall
Engineering Index Backfile | 1929
|Big Span, Big Fun: The Atlantic City Convention Hall
ASCE | 2020
|The Kansas City Convention Hall
Engineering Index Backfile | 1899
Rebuilding the Kansas City convention hall
Engineering Index Backfile | 1900