A platform for research: civil engineering, architecture and urbanism
The Apulian aqueduct
Area served covers 8000 to 10,000 sq. km.; collecting works at Caposele; collecting canal is 55 m. long and has breadth of 3 m.; bottom is formed of concrete; details of principal canal, which starting at Caposele, terminates at Villa Castelli, 244 km. distant; Appenine tunnel is 15,252 km. in length; Croce de Monaco tunnel is 7.38 km. long.
The Apulian aqueduct
Area served covers 8000 to 10,000 sq. km.; collecting works at Caposele; collecting canal is 55 m. long and has breadth of 3 m.; bottom is formed of concrete; details of principal canal, which starting at Caposele, terminates at Villa Castelli, 244 km. distant; Appenine tunnel is 15,252 km. in length; Croce de Monaco tunnel is 7.38 km. long.
The Apulian aqueduct
Engineering
Engineering ; 126
1928
4 pages
39 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
Engineering Index Backfile | 1928
Engineering Index Backfile | 1920
|The Apulian aqueduct, southern Italy
Engineering Index Backfile | 1913
|The completion of the apulian aqueduct
Engineering Index Backfile | 1920