A platform for research: civil engineering, architecture and urbanism
Construction and lighting of the Sacramento municipal airport
Grading and draining of this field presented difficult problem; plan contemplates circular field 2500 ft. diam.; main runway 500 ft. wide; lighting equipment; boundary lights; landing floodlights.
Construction and lighting of the Sacramento municipal airport
Grading and draining of this field presented difficult problem; plan contemplates circular field 2500 ft. diam.; main runway 500 ft. wide; lighting equipment; boundary lights; landing floodlights.
Construction and lighting of the Sacramento municipal airport
Elec. West
Blood, C.R. (author) / Delehanty, W.J. (author)
Electrical West ; 61
1928
4 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Modern lighting system for municipal airport
Engineering Index Backfile | 1950
|Sacramento municipal off-street program
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1929
Engineering Index Backfile | 1940
|